Field Audit Handbook
Version 1.0 · Publication Date: 2025-01-01 · Status: Active
© 2025 DraftVerify™ Standards Initiative. All rights reserved.
F-37 provides a complete operational framework for conducting DraftVerify field audits across breweries, distributors, and venues.
The purpose of this handbook is to ensure uniform scoring, consistent inspection criteria, and high-fidelity traceability across all participating parties.
Field audits validate compliance, identify risk, and ensure that NA draft remains safe, separated, and correctly identified throughout the supply chain.
1. Purpose of Field Audits
Field audits ensure:
- Correct physical identification (F-6, F-7, F-8, F-9)
- NA separation across the supply chain
- Verification workflows are being followed (F-18, F-23, F-29)
- Activation, registry, and traceability integrity (F-12, F-13, F-28, F-31)
- Safe operating conditions
- Documentation accuracy
- Continuous improvement
Audits provide the evidence backbone for DraftVerify certification.
2. Audit Types
2.1 Routine Audit
Scheduled annual or semi-annual inspection.
2.2 Spot Audit
Unannounced inspection triggered by:
- Incident or contamination report (F-22, F-35)
- Distributor or brewery escalation
- Consumer complaint
2.3 Pre-Certification Audit
Performed before a brewery, distributor, or venue may use the DraftVerify Mark (F-32).
2.4 Corrective Action Audit
Focused review to validate remediation after a failure.
3. Audit Preparation
Auditor must gather:
- Facility profile
- Last audit score (if applicable)
- Registry mapping (F-28)
- Activation logs (F-13)
- Verification event logs (F-30)
- Previous discrepancy reports
Equipment required:
- NFC-enabled device
- PPE for cooler/tower areas
- Digital audit form
- Access to F-6 through F-40 standards
4. Audit Sections & Criteria
Audits are divided into six scoring sections, each with mandatory checkpoints.
4.1 Section A — Identity Integrity (Highest Weight)
Checks include:
- Coupler Tags intact, readable, zip-tied correctly
- Line Tags present and placed per F-8
- Tower markers accurate (if used)
- Faucet IDs match system map
- Verification URLs resolve correctly
Failure: Any missing or mismatched NA identity element.
4.2 Section B — NA Separation & Storage
Verifies:
- NA kegs segregated from alcoholic kegs
- Cooler map present and accurate
- No mixed stacking or mixed pallets
- Sidewall ID (if used) intact
Failure: NA keg stored in mixed cooler cluster.
4.3 Section C — Verification Workflow Compliance
Inspects:
- Staff scanning before tapping
- Scan history matches keg rotation
- Venue logbook updated (F-19)
- Switching procedure followed (F-39)
Failure: Staff cannot demonstrate scanning workflow.
4.4 Section D — Mechanical & Draft System Condition
Includes:
- Couplers functioning correctly
- No leaks, foaming, pressure failure
- Faucets maintained properly
- Gas system meets F-26 requirements
- Lines free of residue or odor
Failure: Any mechanical condition affecting product safety.
4.5 Section E — Cleaning & Maintenance Compliance
Checks against:
- Cleaning Log SOP (F-21)
- Proper chemical dilution
- Required rinse cycles
- Tower and faucet disassembly schedule
Failure: Missing cleaning logs or incomplete cycles.
4.6 Section F — Documentation & Traceability
Verifies:
- All DTIs accounted for
- Activation logs match Registry
- Distributor delivery logs correct
- Incident records (if any) present
Failure: Any DTI unaccounted for or inconsistent with registry.
5. Audit Scoring System
Each section scored 0–5:
| Score | Meaning |
|---|---|
| 5 | Full compliance, zero deficiencies |
| 4 | Minor issues, no safety/identity risk |
| 3 | Moderate issues, corrective action required |
| 2 | Significant compliance gaps |
| 1 | Major failure; critical risk |
| 0 | Non-compliant; immediate shutdown for NA service |
5.1 Overall Rating
Total score (out of 30):
- 27–30 → Certified
- 22–26 → Certified with minor corrective actions
- 16–21 → Conditional certification; re-audit required
- 0–15 → Not certified; NA draft service must cease
6. Corrective Action Workflow
If deficiencies are found:
Step 1 — Issue Report
Auditor completes the Corrective Action Notice.
Step 2 — Response Plan
Facility must submit remediation plan within 7 days.
Step 3 — Implementation
Changes must be completed within 30 days.
Step 4 — Verification
Auditor performs targeted re-inspection.
Step 5 — Resolution
Certification restored or withheld based on compliance.
7. Critical Failure Conditions (Immediate Shutdown)
The following mandate immediate suspension of NA draft service:
- Wrong keg tapped or served
- Any alcohol contamination risk
- Missing or tampered Coupler Tag
- NA line mapped incorrectly
- Verification URL mismatch
- Gas system safety hazard
- Cleaning chemical contamination
- Any DTI untraceable
If encountered, the auditor must initiate:
- F-22 Incident Procedure
- F-35 Contamination Report
- Emergency Corrective Action Path
8. Documentation Requirements for Auditors
Auditors must keep:
- Full audit form
- Photo evidence
- Verification scan logs
- Notes on interviews with staff
- Corrective action notices
- Re-audit results
Records retained for 10 years.
9. Audit Tools & Digital Forms
Auditors use:
- Standardized digital forms
- NFC scan logs exported for registry integration
- Automated scoring calculator
- On-site signature capture
Future versions will integrate with the DraftVerify mobile auditor app.
10. Auditor Code of Conduct
Auditors must maintain:
- Neutrality
- Confidentiality
- Consistency
- Accuracy
- Respect for operations
They may not accept gifts, compensation, or incentives from facilities.
11. Summary
The Field Audit Handbook ensures:
- Reliable, repeatable audits
- Strong NA identity protection
- Safe, verified operations
- High compliance with DraftVerify Standards
- Traceability and accountability across the supply chain
Routine and responsive audits reinforce NA safety and trust across the industry.