DraftVerify Trust Every Pour.
DraftVerify Standards Library · F-20

Change Log SOP

Version 1.0 · Publication Date: 2025-01-01 · Status: Active
© 2025 DraftVerify™ Standards Initiative. All rights reserved.

The Change Log SOP defines uniform procedures for documenting, approving, and archiving any change that affects the DraftVerify identity chain, including:

  • Keg identity
  • Coupler tagging
  • Line mapping
  • System configuration
  • Verification workflows
  • Venue or distributor documentation

A consistent change log ensures traceability, auditability, and consumer safety across the DraftVerify ecosystem.


1. Purpose

This SOP ensures that:

  • All changes affecting NA draft identity are recorded
  • Responsibilities are clearly assigned
  • Audit trails remain complete and tamper-resistant
  • Discrepancies can be traced to their origin
  • Regulatory and legal requirements are met

Change logs support risk prevention, investigation, and operational clarity.


2. Scope

Applies to:

  • Breweries
  • Distributors
  • Venues
  • Draft system technicians
  • Third-party maintenance teams

Covers changes to:

  • Product identity records
  • Keg activation or reassignment
  • Coupler Tag installation or replacement
  • Beverage line mapping
  • Tower configuration
  • Draft system modifications
  • Verification workflow adjustments

Does NOT cover:

  • Routine line cleaning (see F-21)
  • Non-identity maintenance tasks

3. When a Change Log Is Required

A log must be created immediately when any of the following occur:

3.1 Identity Changes

  • New DTI assigned
  • Incorrect DTI corrected
  • Keg reactivated after quarantine
  • Coupler Tag replaced

3.2 System or Line Changes

  • New draft line added
  • Line reassigned to another product
  • Tower position changed
  • Equipment replaced (coupler, faucet, line segment)

3.3 Verification Workflow Changes

  • New staff trained
  • Update to scanning protocol
  • Process deviations

3.4 Discrepancy Resolution

Changes made during resolution of incidents covered under F-22 — Mis-Serve Procedure must be logged.


4. Required Change Log Fields

Each entry must include:

Field Description
Date & Time When the change occurred
Location Brewery, distributor, or venue
Responsible Person Name + role
Type of Change Identity / System / Workflow / Discrepancy
Before State What existed prior to change
After State Updated configuration or identity
DTI(s) Involved If applicable
Reason for Change Why the modification was made
Verification Completed? Yes/No + method
Approver Supervisor or manager signature

Logs may be stored in:

  • Digital DraftVerify Registry
  • Venue or distributor logbooks
  • Brewery activation records

5. Change Log Workflow

Step 1 — Identify

Staff detects a needed change (identity issue, reassignment, equipment swap, etc.).

Step 2 — Document

Record the change immediately using the required fields.

Step 3 — Verify

Confirm the new configuration by:

  • NFC scan
  • Visual inspection
  • System mapping check
  • Tower/line alignment

Step 4 — Approve

Supervisor or manager signs the change log.

Step 5 — Archive

Store the entry in local or digital records for minimum 12 months.

Step 6 — Notify (If Required)

Notify upstream or downstream partners if the change affects:

  • Product routing
  • Distributor handling
  • Venue service
  • Batch traceability

6. Roles & Responsibilities

6.1 Staff

  • Identify and report changes
  • Document accurately
  • Follow approval workflow

6.2 Supervisors / Managers

  • Approve or reject proposed changes
  • Ensure accuracy of logs
  • Maintain archive integrity

6.3 Breweries

  • Update activation records
  • Perform identity reconciliation if needed

6.4 Distributors

  • Ensure traceability in transit
  • Communicate changes to venues

6.5 Venues

  • Maintain accurate tower/line mapping
  • Record any keg or line changes made on-site

7. Storage & Retention Requirements

Change logs must be:

  • Stored securely
  • Accessible during audits
  • Immutable (no overwriting)
  • Retained for minimum 12 months
  • Digitized when possible

For high-volume multi-venue operators (F-34), logs may need 24–36 month retention.


8. Audit Use of Change Logs

Auditors use logs to:

  • Validate proper NA separation
  • Confirm correct tapping history
  • Verify identity reconciliation
  • Investigate any mis-serve or discrepancy
  • Ensure staff followed required workflows

Missing or incomplete logs constitute non-compliance.


9. Common Errors (and How to Avoid Them)

  • Failure to log a keg identity correction → Always document corrections.
  • Replacing a Coupler Tag without record → Must always be logged.
  • Changing tower positions without updating mapping → Log and update immediately.
  • Staff forgetting approval signatures → Managers must review daily.

10. Summary

The Change Log SOP ensures:

  • Full traceability
  • Identity integrity
  • Regulatory alignment
  • Correct system configuration
  • Clear audit trails
  • Reduced mis-serve risk

Accurate and consistent documentation protects the venue, the distributor, the brewery, and the consumer.