DraftVerify Trust Every Pour.
DraftVerify Standards Library · F-19

Daily / Weekly Verification Checklist

Version 1.0 · Publication Date: 2025-01-01 · Status: Active
© 2025 DraftVerify™ Standards Initiative. All rights reserved.

F-19 provides a standardized, auditable checklist for venues serving non-alcoholic (NA) draft.
This checklist is designed to:

  • Prevent mis-taps
  • Maintain NA identity and separation
  • Ensure verification practices remain consistent
  • Document compliance for audits and incident review

This is the venue’s front-line operational tool, used daily and weekly.


1. Purpose of the Checklist

The checklist ensures:

  • Correct NA keg is connected
  • Verification scans occur on schedule
  • Identification components remain intact
  • Cooler and tower organization meet DraftVerify standards
  • Issues are documented and escalated appropriately

This serves both as a compliance document and a training reinforcement tool.


2. How to Use This Checklist

  • Complete Daily Checklist every day before service.
  • Complete Weekly Checklist every 7 days.
  • Keep all completed checklists in venue records for at least 12 months.
  • Provide logs during audits (F-33) or incident investigations (F-22).

3. Daily Verification Checklist

3.1 Front-of-House (FOH)

Item Check Notes
Tower marker is visible and correctly placed  
Faucet serving NA is correctly labeled  
No unauthorized product switching on tower  
Staff know which faucet serves NA draft  

3.2 Back-of-House (Cooler)

Item Check Notes
Line Tag is visible and intact  
Coupler Tag zip tie intact and secure  
Coupler Tag not rotating freely  
No signs of tampering or tag damage  
NA keg identity matches expected product  
Cooler maintains NA separation  
NA keg not buried under alcoholic kegs  
Keg positioned with tag facing outward  

3.3 Verification Scan (Daily)

Before opening:

Item Check Notes
Coupler Tag scanned successfully  
Verification page matches product  
Tag status = Active  
DTI matches current keg documentation  

If scan fails → STOP SERVICE, follow F-22 Incident Response.


4. Weekly Verification Checklist

4.1 System Integrity

Item Check Notes
Re-scan active keg  
Confirm NA line is still dedicated  
Cooler map updated if placement changed  
Check line tag for wear or fading  
Inspect tower marker placement  
Confirm staff followed switching protocol  

4.2 Product Switching Review

Item Check Notes
Any keg changes documented  
Verification scans recorded for each change  
Empty keg removed without cutting tag  
No evidence of incorrect keg switching  

4.3 Cleaning & Maintenance

Item Check Notes
Faucet cleaned according to venue schedule  
Line cleaning logged (F-21 reference)  
No residue, blockages, or leaks  

5. Required Records

Venues must maintain:

  • Completed daily checklists
  • Completed weekly checklists
  • Verification scan logs
  • Product switching records
  • Incident reports (per F-22)
  • Cooler layout diagrams (if applicable)

Records support compliance audits and issue resolution.


6. Non-Compliance Conditions

A venue is non-compliant if:

  • Daily or weekly checklists are missing
  • Verification scans are not performed
  • Coupler Tag is missing or compromised
  • NA identity is unclear or mislabeled
  • NA separation is not maintained

Corrective action is required immediately.


7. Summary

F-19 ensures that venues maintain:

  • Clear NA identification
  • Daily verification discipline
  • Weekly operational review
  • Traceable documentation
  • Safe service practices

This checklist reinforces the DraftVerify Standard every single day, protecting consumers and ensuring consistent, trusted NA draft service.